Friends of the North Australia |
|---|
Above - the fully restored vertical boiler and steam pump designed to lift water from the reservoir to the 26,000 gallon elevated water tank at the rear of the station. Watering infrastructure was located at intervals of 30 miles on the North Australia Railway. |
NEWLETTER ARCHIVE: |
|---|